Where two quotes stop being comparable
Two bids for the same house can differ by thousands and both be honest, because they are quoting different amounts of work. Almost none of that difference is in the equipment. It is in the six or seven items below, most of which appear in neither proposal until you ask.
The standard scope
What a normal ductless quote assumes: one outdoor unit, the indoor heads for the zones being served, mounting brackets or a ground pad, basic electrical connections at both ends, refrigerant line, evacuation and charging, and a standard line-set run of about 15 feet [1]. That last number is the one that quietly does the most damage, because it is an assumption about your house that nobody stated out loud and that the estimator may not have measured.
Refrigerant line is not cable. Past a certain length manufacturers require additional charge, and past a further length a different line diameter, both of which change the equipment specification rather than merely the material bill. A quote that assumed a short run and encounters a long one on the day does not become slightly more expensive; it becomes a change order.
The list to get in writing
These are the items this site deliberately excludes from its own estimate, and they are excluded for the same reason they should be itemised on your quote — they vary far too much between houses to carry a default.
- line set beyond the ~15 ft a standard quote includes — no source we could cite publishes a price per foot, so we publish none
- a main electrical panel or service upgrade — our two sources disagree by roughly threefold, so we price neither
- removing and disposing of whatever is there now
- drywall patching, painting, and exterior siding repair around the wall penetration
- condensate pumps and any drain routing that cannot fall by gravity
- the permit fee, because we have only verified one jurisdiction's published schedule
Print that list and read it down the phone. Every line is a yes-or-no question with a dollar consequence, and asking takes two minutes. The electrical one is the most common surprise on a first install: if the panel is full, an electrician has to make room, and a dedicated circuit alone averages $650[2] before anyone touches the panel itself.
Four questions that separate a real proposal from a price
What did you size this on?
The answer you want describes your rooms — areas, orientations, window areas, insulation. The answer you do not want is a square-foot rule of thumb, because the published table this site is built on implies anywhere from twenty to thirty-three BTU per square foot depending purely on room size. A single multiplier is wrong at one end or the other by construction.
How long is the line set, and did you measure it?
Not estimated from the driveway. Measured, including the vertical rise, because the vertical distance between the outdoor unit and the heads has its own manufacturer limits and its own oil-return implications.
Who pulls the permit, and is the fee in this number?
Both halves matter. An installer who intends to pull it will say so immediately; one who hesitates is telling you something. And if the fee is not in the quoted figure, it is about to be a separate invoice.
What happens to the condensate?
Every cooling head produces water and it has to go somewhere. Gravity to the outside is free and reliable; a pump is neither, and a pump that was not in the quote is a change order plus a component that will eventually fail in a wall.
How to compare two bids once you have the answers
Normalise before you compare. Write both quotes out as the same line items — equipment, heads, line set, electrical, permit, patching, disposal — and fill the gaps with the answers you got by phone. Very often the cheaper bid becomes the dearer one at this step, because its number assumed a short run and an available breaker.
Then look at what is left over, which is usually labour and margin, and be honest that this part is not a defect. A crew that measures the line set, pulls the permit, sets the charge properly and comes back when something drips is worth more than one that does not, and the gap between them is exactly the number you were about to treat as overpricing.
- The permit and the panel in detailOne real fee schedule, and the electrical cost we refuse to guess at.
- Build your own comparison figureA sourced band for the same scope, so you know what normal looks like.
- Check the head count firstThe cheapest change to a quote is usually one fewer zone.
Questions people actually ask about this
What is included in a mini-split installation quote?
Typically the outdoor unit, the indoor heads, basic electrical connections, mounting brackets or a pad, refrigerant line and a standard run of about 15 feet, plus commissioning. What is excluded varies enormously and is where two quotes diverge.
How long is a standard line set?
About 15 feet in most quotes. Longer runs cost more, and past roughly 25 feet many manufacturers require additional refrigerant charge and sometimes a larger line diameter — which is a specification question, not just a length question.
Why will this site not tell me the price per foot of line set?
Because we could not obtain that figure from any source we were prepared to cite. The direction is sourced — longer costs more — and the number is not, so we publish the direction and leave the number to your contractor.
Should the quote mention a load calculation?
Ideally yes. A room-by-room load calculation is the difference between equipment chosen for your house and equipment chosen from a table. If the proposal contains no sizing reasoning at all, ask what it was based on.
Where each figure on this page came from
- HomeGuide, Ductless mini split installation cost (updated October 8, 2025) — https://homeguide.com/costs/ductless-mini-split-ac-cost (retrieved 2026-08-06)
- HomeGuide, Cost to install a dedicated circuit (October 15, 2025) — https://homeguide.com/costs/cost-to-install-a-dedicated-circuit (retrieved 2026-08-06)
The source states the direction only. We could not obtain any published dollars-per-foot price for line set beyond the standard run from a source we were willing to cite, so this site prints none. A long run moves the estimate toward the top of the sourced band and is listed as an itemise-it-in-writing question for the contractor.